Re:Danger Looms In Owerri Over Gas Plant In Residential Area …OCDA Condemns Media Attack On The Authority, says faceless writer claimed
By Dan Opara
The attention of the Special Adviser to the Governor and General Manager of Owerri Capital Development Authority OCDA,Hon.Engr.Francis Chukwu, has been drawn to an intentional publication of falsehood by Imo Trumpeta Newspaper, of Tuesday,18th October, 2022.


In the aforementioned edition of Newspaper, we read with dismay and utter disbelief the screaming story with the Heading: “DANGER LOOMS IN OWERRI OVER GAS PLANT IN RESIDENTIAL AREA”.
“In the publication, the faceless writer claimed the purported construction of Gas Plant at the densely populated area of Ikenegbu Extension by Relief Market road Owerri.”
The attention seeking writer in a bid to deceitfully paint a picture of a concerned individual stated further that “Unless the State Government mandates one of its Agencies Owerri Capital Development Authority to ensure the compliance to building plans approval, there is a possibility of putting all the inhabitants of the area in danger”.

Ordinarily, we would have seen this as not being worthy of our response.
However, we hereby consider it fit to do so in order avoid having the unsuspecting public misinformed, misled and most importantly sacred for no reason, as the writer had maliciously intended.
Thus, for us to place the records straight and for clarity purposes, there is no Gas Plant being constructed at the location as claimed rather what is being constructed is a Water Reservoir which the developer did not initially seek approval from Owerri Capital Development Authority,OCDA,untill the result oriented Agency led by the ever proactive and vibrant Engr.Francis Chukwu, during one of its routine Operational Activities Swooped at the site and then the developer was mandated to visit the agency of which he did and confirmed that it was a water ditch that he was constructing.
It is paramount for us to mention that when the plan for the construction of the Water Reservoir was brought to the Agency by the Developer the Town Planning Department of the Agency as it remains their statutory duty, went on Inspection as a follow-up to the initial move by the Operational Team to confirm the Watereservoir facility.
So, we were very shocked to read on one of the pages of Imo Trumpeta Newspaper that Gas Plant has been sited at a residential area.
Obviously, it is very unfortunate that Imo Trumpeta Newspaper failed to carryout proper investigation in line with investigative journalism before publishing such a malicious and misleading story. It is also very worrisome that the tabloid equally failed woefully to uphold the ethics of journalism of always ensuring balanced reportage by contacting either the General Manager of OCDA or any notable official of the Agency in order to ascertain the accurate point regarding the facility being constructed of which doing so would have averted the unnecessary and insensitive sensational report which they decided to peddle for reasons best known to them.
Apparently, it is inconsistent, incomprehensible and contradictory that the picture of the popular ASSUMPTA CATHEDRAL which belongs to the Catholic Archdiocese of Owerri was used for the publication instead of the picture of the unfounded Gas Plant they claimed to be under construction.
Therefore, we challenge the writer and the Publisher to explain the rationale behind using the picture of Assumpta Catheral Owerri to publish a supposed and purported Human Safety report.
This clearly lays credence to the fact that the publication was deliberately designed to raise false alarm, cause panic and to mislead unsuspecting readers and members of the public.
In conclusion, while we call on the members of the Public especially the residents of the area to disregard the report, we wish to also use this medium to assure them that Owerri Capital Development Authority,OCDA,under the helmsmanship of Engr.Francis Chukwu remains ever ready, poised and focused towards ensuring the effective Development Control as the Agency through its various Personnel and Teams are always on red alert to ensure that no building or structure is erected within the Owerri Capital City and its environs without proper approval just as the Engr.Francis Chukwu’s led Operational Team equally makes sure that what is approved is what the Developers put on ground thereby not giving any room for any form of manipulation both in the approval process as well as the building construction in particular.
Evidently, as it has been our tradition of always backing up our facts with documented evidence, we hereby attach pictures of the site in question which showcase the Water Reservoir that is being constructed for resounding clarification and accurateness.
The press statement was ably signed by Comr.Eberechukwu Okechukwu, the SA Media to the GM,OCDA,on 20/10/2022.



